Skip to content

Categories:

Packing & Transport

Packing and Transport Workflow: BPMN Version 2

movementpackingandtransportbpmnv2

Meeting Chart 1 - as plotted in the community design meeting

Meeting Discussion 1 - as presented in the community design meeting


4 Responses

Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.

  1. Robert van Langh says

    if we would implement this, i am sure our board of directors would say that we are becoming too much of administrative tigers..

  2. 18090000 says

    Statens Museum for Kunst/KV
    Trigger could include: conservation and photography.
    In relation to Condition Report we generate a document, when necessary, concerning ‘Packing and Installation’. This document includes guidelines about how the work is packed and how it should be handled and installed.

  3. Angela Spinazze says

    Hi Robert,
    Administrative tigers, I like that. So which bits of this workflow do you currently do?

  4. Angela Spinazze says

    Hi SMK,
    We will add conservation and photography to the triggering events. And, a documentation box for packing and installation. Do we place this document in the middle section after ‘Risk Assessment’ or nearer the bottom, after the ‘Yes’ decision in line with ‘Condition Report’?

You must be logged in to post a comment.